Caught up in 90 seconds.
Two things need you this morning: Will S. wants permission to read vendor contracts for the Q3 variance run, and @Job Poster has v2 of the junior engineer posting waiting on your sign-off. Otherwise the close is on track — three lines flagged, all under control. Will S. and Ben P. already gave feedback on the posting overnight. Andy H. flagged five over-threshold invoices — needs your eyes on $48.2K.
Needs your action 2
By Habitat 6 with activity
@Job Poster drafted v1 last night. Ben P. said the intro buries the lead and Will S. wanted the comp range pulled and the LLM line specific'd to Claude Code. v2 is in the doc with three suggestions waiting on you. Quick read — 3 minutes.
Will S. kicked off Project Mountain (Berger) — comp screen running now, ETA 4 minutes. @GTO Deck needs you to confirm the Alpine analog before the full memo run. Hancock Firm closed yesterday at 78% theme fit ($48.20) — Ben P. already promoted the summary to Pipeline Review.
Three more deals are in the queue (Project Birch, Project Cedar, Project Aspen) — each waiting on materials.
@FSD Stats finished pulling v14.3 telemetry off the Gigalytics MCP — 92.4% no-intervention across 11,420 drives, up from 88.1% on v14.2. Will S. wants @Twitter to queue the thread; Andy H. is asking for the highway-vs-surface breakdown. Chart is in the workstream.
@Source Code dropped a summary of PR #284 · Fix charge curve on cold-soak start — 7 files (+312 / −98) closing #312 and #318. The diff and the new test fixtures are inline; the rate-limit clamp is flagged as a TODO worth discussing.
Hedda approved Q3 Calendar v3 last night — "the 6-month booster ones are so much better, thank you." All 12 campaigns sit as drafts in Mailchimp ready for her to schedule. Nothing for you to do here.
@Job Poster finished v2 of the JD — posted to LinkedIn + Workable. Andy H. left 3 suggestions on the seniority signaling. Worth a quick read in your action queue.